253 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-09-28
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Grand Mesa BESS is a 253 MW Battery project in Texas, currently active.

PERRY GREEN POWER LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-09-28.

Queue ID
ERCOT-26INR0550
Location
Pecos, Texas
Technology
Battery
Developer
PERRY GREEN POWER LLC
Market / region
ERCOT
Point of interconnection
76582 MESA VIEW SWITCH 138kV

What stands out

1

Grand Mesa BESS is a 253 MW Battery project in Texas with status active.

2

PERRY GREEN POWER LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-09-28.

Market and operating context

Queue date
2024-08-16
Proposed COD
2027-09-28
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Grand Mesa BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0550
LocationPecos, Texas
TechnologyBattery
DeveloperPERRY GREEN POWER LLC
Market / regionERCOT
Point of interconnection76582 MESA VIEW SWITCH 138kV
Queue date2024-08-16