Query
High Chaparral BESS 138kV
Type
Entity Briefing
Entity
High Chaparral BESS 138kV
State
MI
Technology
battery
Generated
2026-10-19T10:40:29.965Z

Briefing on High Chaparral BESS 138kV

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
52 MW
Proposed capacity
suspended
Current status
Battery
Technology
ERCOT
Market / region
2023-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectsuspended

High Chaparral BESS 138kV is a 52 MW Battery project in Texas, currently suspended.

High Chaparral Solar Project, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2023-12-31.

Queue ID
ERCOT-23INR0158
Location
Brazoria, Texas
Technology
Battery
Developer
High Chaparral Solar Project, LLC
Market / region
ERCOT
Point of interconnection
tap 138kV 42110 Angleton - 42875 Danbury c04

What stands out

1

High Chaparral BESS 138kV is a 52 MW Battery project in Texas with status suspended.

2

High Chaparral Solar Project, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2023-12-31.

Market and operating context

Queue date
2021-01-25
Proposed COD
2023-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

High Chaparral BESS 138kV — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0158
LocationBrazoria, Texas
TechnologyBattery
DeveloperHigh Chaparral Solar Project, LLC
Market / regionERCOT
Point of interconnectiontap 138kV 42110 Angleton - 42875 Danbury c04
Queue date2021-01-25
Proposed COD2023-12-31