Briefing/projectactive
Hidden Valley BESS is a 10 MW Battery project in Texas, currently active.
Regis Hidden Valley, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-03-27.
- Queue ID
- ERCOT-24INR0594
- Location
- Harris, Texas
- Technology
- Battery
- Developer
- Regis Hidden Valley, LLC
- Market / region
- ERCOT
- Point of interconnection
- Station Name (TSP Station Code): Hidden Valley (HV) Load/Load Transformer Name: TR4 PTI Bus Number: 45862 Voltage in kV (Transmission Level): 138 kV
What stands out
1
Hidden Valley BESS is a 10 MW Battery project in Texas with status active.
2
Regis Hidden Valley, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-03-27.
Market and operating context
- Proposed COD
- 2026-03-27
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.