4 MW
Capacity
Operating
Current status
2010
Operating since
12
Generators
16.5%
Capacity factor
5 GWh
Annual generation
Briefing/plantOperating

Henrico is a 4 MW Landfill Gas asset in PJM Interconnection, currently Operating.

Henrico is reported in Virginia since 2010 under Industrial Power Generating Company LLC. Available operating and financial measures include 16.5% capacity factor and 5 GWh annual generation; $3495/kW reported CapEx.

Location
Henrico, Virginia
Technology
Landfill Gas
Owner / parent
Industrial Power Generating Company LLC
Operator
Industrial Power Generating Company LLC
Grid
PJM Interconnection
Plant ID
57356

What stands out

1

Henrico is a 4 MW Landfill Gas asset in Virginia with status Operating.

2

Latest annual operating measures report 16.5% capacity factor and 5 GWh annual generation.

3

Available financial measures include $3495/kW CapEx.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
SERC
State rank
#10 of 13
National rank
#158 of 282

Why it matters