Hemlock Ridge Solar is a 200 MW Solar project in New York, currently active.
Hemlock Ridge Solar LLC is the reported developer. The reported queue phase is System Impact Study. Proposed COD is 2028-04-01.
- Queue ID
- NYISO-950
- Location
- Orleans, New York
- Technology
- Solar
- Developer
- Hemlock Ridge Solar LLC
- Market / region
- NYISO
- Point of interconnection
- Lockport - Mortimer 115kV
What stands out
Hemlock Ridge Solar is a 200 MW Solar project in New York with status active.
Hemlock Ridge Solar LLC is the reported developer.
The reported queue phase is System Impact Study; proposed COD is 2028-04-01.
Latest linked story: “AES celebrates completion of solar projects in Albion, Barre” (Orleans Hub, 2025-09-25).
Market and operating context
- Queue date
- 2019-11-21
- Proposed COD
- 2028-04-01
- IA status
- System Impact Study
- Study phase
- System Impact Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.