Briefing/plantOperating
HEBTEMDistCenter2A is a 3 MW Natural Gas Internal Combustion Engine asset in ERCOT (Texas), currently Operating.
HEBTEMDistCenter2A is reported in Texas since 2024 under Texas Microgrid, LLC. Available operating and financial measures include $782/kW reported CapEx.
- Location
- Bell, Texas
- Technology
- Natural Gas Internal Combustion Engine
- Owner / parent
- Texas Microgrid, LLC
- Operator
- Texas Microgrid, LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 68736
What stands out
1
HEBTEMDistCenter2A is a 3 MW Natural Gas Internal Combustion Engine asset in Texas with status Operating.
2
Available financial measures include $782/kW CapEx.
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #196 of 325
- National rank
- #1737 of 2,025
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.