Query
HEBCCBakery
Type
Entity Briefing
Entity
HEBCCBakery
Summary generated
Oct 20, 2026
First saved
Date not recorded

Briefing on HEBCCBakery

Entity Briefing

Summary generated Oct 20, 2026 (UTC).

Source dates used by this summary were not recorded.

3 MW
Capacity
Operating
Current status
2019
Operating since
8
Generators
2.8%
Capacity factor
1 GWh
Annual generation
Briefing/plantOperating

HEBCCBakery is a 3 MW Natural Gas Internal Combustion Engine asset in ERCOT (Texas), currently Operating.

HEBCCBakery is reported in Texas since 2019 under Texas Microgrid, LLC. Available operating and financial measures include 2.8% capacity factor and 1 GWh annual generation; $1078/kW reported CapEx.

Location
Nueces, Texas
Technology
Natural Gas Internal Combustion Engine
Owner / parent
Texas Microgrid, LLC
Operator
Texas Microgrid, LLC
Grid
ERCOT (Texas)
Plant ID
66565

What stands out

1

HEBCCBakery is a 3 MW Natural Gas Internal Combustion Engine asset in Texas with status Operating.

2

Latest annual operating measures report 2.8% capacity factor and 1 GWh annual generation.

3

Available financial measures include $1078/kW CapEx.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#194 of 325
National rank
#1739 of 2,025

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.