Query
Hays Energy Unit 3 Repower
Type
Entity Briefing
Entity
Hays Energy Unit 3 Repower
Generated
2026-10-19T05:46:05.465Z

Briefing on Hays Energy Unit 3 Repower

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
18 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2026-12-03
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Hays Energy Unit 3 Repower is a 18 MW Gas project in Texas, currently active.

Vistra is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-03.

Queue ID
ERCOT-21INR0527
Location
Hays, Texas
Technology
Gas
Developer
Vistra
Market / region
ERCOT
Point of interconnection
7043 Hays 345kV

What stands out

1

Hays Energy Unit 3 Repower is a 18 MW Gas project in Texas with status active.

2

Vistra is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-12-03.

Market and operating context

Queue date
2020-10-07
Proposed COD
2026-12-03
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Hays Energy Unit 3 Repower — verified asset snapshot

FieldValue
Queue IDERCOT-21INR0527
LocationHays, Texas
TechnologyGas
DeveloperVistra
Market / regionERCOT
Point of interconnection7043 Hays 345kV
Queue date2020-10-07
Proposed COD2026-12-03