Briefing/plantPlanned
Harryoung PV and BESS is a 380 MW Batteries asset in ERCOT (Texas), currently Planned.
Harryoung PV and BESS is reported in Texas under Gransolar Texas Four LLC. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Cameron, Texas
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Gransolar Texas Four LLC
- Operator
- Gransolar Texas Four LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 67777
What stands out
1
Harryoung PV and BESS is a 380 MW Batteries asset in Texas with status Planned.
2
Available financial measures include $1361/kW CapEx.
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #20 of 344
- National rank
- #78 of 994
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.