Briefing on HARMONY STORAGE 2

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
308 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2031-06-05
Proposed COD
C14
Queue phase
Briefing/projectactive

HARMONY STORAGE 2 is a 308 MW Battery project in California, currently active.

The reported queue phase is C14. Proposed COD is 2031-06-05.

Queue ID
CAISO-1892
Location
Contra Costa, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Contra Costa PP 230 kV

What stands out

1

HARMONY STORAGE 2 is a 308 MW Battery project in California with status active.

2

The reported queue phase is C14; proposed COD is 2031-06-05.

Market and operating context

Queue date
2021-04-15
Proposed COD
2031-06-05
IA status
System Impact Study
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

HARMONY STORAGE 2 — verified asset snapshot

FieldValue
Queue IDCAISO-1892
LocationContra Costa, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionContra Costa PP 230 kV
Queue date2021-04-15
Proposed COD2031-06-05
IA statusSystem Impact Study