Briefing/projectactive
Harley Hand Solar is a 506 MW Solar+Battery project in Texas, currently active.
HECTATE ENERGY HARLEY HAND SOLAR LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-07.
- Queue ID
- ERCOT-23INR0008
- Location
- Nolan, Texas
- Technology
- Solar+Battery
- Developer
- HECTATE ENERGY HARLEY HAND SOLAR LLC
- Market / region
- ERCOT
- Point of interconnection
- 11420 Sweetwater East 345kV
What stands out
1
Harley Hand Solar is a 506 MW Solar+Battery project in Texas with status active.
2
HECTATE ENERGY HARLEY HAND SOLAR LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-04-07.
Market and operating context
- Queue date
- 2019-12-16
- Proposed COD
- 2029-04-07
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.