Happy Jack Windpower Project is a 29 MW Onshore Wind Turbine asset in Wyoming, currently Operating.
Happy Jack Windpower Project is reported in Wyoming since 2008 under Duke Energy. Available operating and financial measures include 22.8% capacity factor and 59 GWh annual generation; $1895/kW reported CapEx.
- Location
- Laramie, Wyoming
- Technology
- Onshore Wind Turbine
- Owner / parent
- Duke Energy
- Operator
- Duke Energy Renewables Services
- Grid
- Western Area Power Administration UGP West
- Plant ID
- 56960
What stands out
Happy Jack Windpower Project is a 29 MW Onshore Wind Turbine asset in Wyoming with status Operating.
Latest annual operating measures report 22.8% capacity factor and 59 GWh annual generation.
Available financial measures include $1895/kW CapEx.
Latest linked story: “Top executive at Duke Energy Renewables sees bright future for solar growth” (The Business Journals, 2020-08-03).
Market and operating context
- Balancing authority
- Western Area Power Administration UGP West
- NERC region
- WECC
- State rank
- #29 of 31
- National rank
- #1045 of 1,442
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.