Query
H M Jackson
Type
Entity Briefing
Entity
H M Jackson
Generated
2026-10-20T04:36:21.582Z

Briefing on H M Jackson

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
112 MW
Capacity
Operating
Current status
1984
Operating since
4
Generators
37.2%
Capacity factor
366 GWh
Annual generation
Briefing/plantOperating

H M Jackson is a 112 MW Conventional Hydroelectric asset in Washington, currently Operating.

H M Jackson is reported in Washington since 1984 under PUD No 1 of Snohomish County - (WA). Available operating and financial measures include 37.2% capacity factor and 366 GWh annual generation; $2294/kW reported CapEx.

Location
Snohomish, Washington
Technology
Conventional Hydroelectric
Owner / parent
PUD No 1 of Snohomish County - (WA)
Operator
PUD No 1 of Snohomish County - (WA)
Grid
Bonneville Power Administration
Plant ID
7588

What stands out

1

H M Jackson is a 112 MW Conventional Hydroelectric asset in Washington with status Operating.

2

Latest annual operating measures report 37.2% capacity factor and 366 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

Balancing authority
Bonneville Power Administration
NERC region
WECC
State rank
#21 of 73
National rank
#167 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.