Briefing/projectactive
Gusty Windpower is a 209 MW Wind project in Texas, currently active.
Gusty Windpower, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-12-31.
- Queue ID
- ERCOT-29INR0040
- Location
- Glasscock, Texas
- Technology
- Wind
- Developer
- Gusty Windpower, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 59903 Bearkat - 1058 Longshore_5; Anemone 345 kV Station
What stands out
1
Gusty Windpower is a 209 MW Wind project in Texas with status active.
2
Gusty Windpower, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2028-12-31.
4
Latest linked story: “How Palm Springs learned to love its wind turbines” (The Washington Post, 2025-08-24).
Market and operating context
- Queue date
- 2024-07-30
- Proposed COD
- 2028-12-31
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.