Gusty Windpower is a 209 MW Wind project in Texas, currently active.

Gusty Windpower, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-12-31.

Queue ID
ERCOT-29INR0040
Location
Glasscock, Texas
Technology
Wind
Developer
Gusty Windpower, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 59903 Bearkat - 1058 Longshore_5; Anemone 345 kV Station

What stands out

1

Gusty Windpower is a 209 MW Wind project in Texas with status active.

2

Gusty Windpower, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-12-31.

4

Latest linked story: “How Palm Springs learned to love its wind turbines” (The Washington Post, 2025-08-24).

Market and operating context

Queue date
2024-07-30
Proposed COD
2028-12-31
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Gusty Windpower — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0040
LocationGlasscock, Texas
TechnologyWind
DeveloperGusty Windpower, LLC
Market / regionERCOT
Point of interconnectionTap 345kV 59903 Bearkat - 1058 Longshore_5; Anemone 345 kV Station
Queue date2024-07-30
Proposed COD2028-12-31