Briefing on Gulf Prairie BESS

Entity Briefing
Generated Sep 19, 2026·Dataset freshness not reported
208 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Gulf Prairie BESS is a 208 MW Solar+Battery project in Texas, currently active.

Gulf Prairie Energy LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-01.

Queue ID
ERCOT-28INR0448
Location
Brazoria, Texas
Technology
Solar+Battery
Developer
Gulf Prairie Energy LLC
Market / region
ERCOT
Point of interconnection
(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640)

What stands out

1

Gulf Prairie BESS is a 208 MW Solar+Battery project in Texas with status active.

2

Gulf Prairie Energy LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-01.

Market and operating context

Queue date
2025-09-22
Proposed COD
2028-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Gulf Prairie BESS — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0448
LocationBrazoria, Texas
TechnologySolar+Battery
DeveloperGulf Prairie Energy LLC
Market / regionERCOT
Point of interconnection(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640)
Queue date2025-09-22
Proposed COD2028-12-01