Briefing/projectactive
Gulf Prairie BESS is a 208 MW Solar+Battery project in Texas, currently active.
Gulf Prairie Energy LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-01.
- Queue ID
- ERCOT-28INR0448
- Location
- Brazoria, Texas
- Technology
- Solar+Battery
- Developer
- Gulf Prairie Energy LLC
- Market / region
- ERCOT
- Point of interconnection
- (CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640)
What stands out
1
Gulf Prairie BESS is a 208 MW Solar+Battery project in Texas with status active.
2
Gulf Prairie Energy LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-12-01.
Market and operating context
- Queue date
- 2025-09-22
- Proposed COD
- 2028-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.