Query
Gulf Gateway Solar One Battery Storage in ISO New England queue pipeline — 1 projects by technology and status
Type
Entity Briefing
Entity
Gulf Gateway Solar One
ISO/RTO
isone
Technology
battery
Generated
2026-10-14T03:00:28.372Z

Briefing on Gulf Gateway Solar One

Entity Briefing
Generated Oct 14, 2026·Dataset freshness not reported
301 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2029-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Gulf Gateway Solar One is a 301 MW Solar+Battery project in Texas, currently active.

Gulf Gateway Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-01.

Queue ID
ERCOT-27INR0492
Location
San Patricio, Texas
Technology
Solar+Battery
Developer
Gulf Gateway Solar, LLC
Market / region
ERCOT
Point of interconnection
88249 SDI7A 345kV

What stands out

1

Gulf Gateway Solar One is a 301 MW Solar+Battery project in Texas with status active.

2

Gulf Gateway Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-12-01.

Market and operating context

Queue date
2025-04-21
Proposed COD
2029-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Gulf Gateway Solar One — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0492
LocationSan Patricio, Texas
TechnologySolar+Battery
DeveloperGulf Gateway Solar, LLC
Market / regionERCOT
Point of interconnection88249 SDI7A 345kV
Queue date2025-04-21
Proposed COD2029-12-01