GSPP 641 Ferris Road East is a 4 MW Solar Photovoltaic asset in ISO New England, currently Operating.
GSPP 641 Ferris Road East is reported in New York since 2024 under Green Street Power Partners. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $2584/kW reported CapEx.
- Location
- St. Lawrence, New York
- Technology
- Solar Photovoltaic
- Owner / parent
- Green Street Power Partners
- Operator
- Green Street Power Partners
- Grid
- ISO New England
- Plant ID
- 68637
What stands out
GSPP 641 Ferris Road East is a 4 MW Solar Photovoltaic asset in New York with status Operating.
Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.
Available financial measures include $2584/kW CapEx.
Market and operating context
- ISO / market
- ISO New England
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
- State rank
- #405 of 778
- National rank
- #4125 of 7,971
Why it matters
For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.