Query
Grossmont HS Solar Project
Type
Entity Briefing
Entity
Grossmont HS Solar Project
Technology
solar
Generated
2026-10-18T00:45:32.723Z

Briefing on Grossmont HS Solar Project

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
1 MW
Capacity
Operating
Current status
2018
Operating since
1
Generators
14.5%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

Grossmont HS Solar Project is a 1 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Grossmont HS Solar Project is reported in California since 2018 under MN8 Energy LLC. Available operating and financial measures include 14.5% capacity factor and 2 GWh annual generation; $17.6/MWh reported energy value.

Location
San Diego, California
Technology
Solar Photovoltaic
Owner / parent
MN8 Energy LLC
Operator
MN8 Energy LLC
Grid
CAISO (California)
Plant ID
62987

What stands out

1

Grossmont HS Solar Project is a 1 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 14.5% capacity factor and 2 GWh annual generation.

3

Available financial measures include $17.6/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#797 of 992
National rank
#6841 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.