Query
Grossmont-Cuyamaca-Cuyamaca Col. Solar &
Type
Entity Briefing
Entity
Grossmont-Cuyamaca-Cuyamaca Col. Solar &
State
CO
Technology
solar
Generated
2026-10-10T12:34:30.136Z

Briefing on Grossmont-Cuyamaca-Cuyamaca Col. Solar &

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2024
Operating since
2
Generators
13.4%
Capacity factor
3 GWh
Annual generation
Briefing/plantOperating

Grossmont-Cuyamaca-Cuyamaca Col. Solar & is a 2 MW Batteries asset in CAISO (California), currently Operating.

Grossmont-Cuyamaca-Cuyamaca Col. Solar & is reported in California since 2024 under Forefront Power, LLC. Available operating and financial measures include 13.4% capacity factor and 3 GWh annual generation; $1544/kW reported CapEx.

Location
San Diego, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
Forefront Power, LLC
Operator
Forefront Power, LLC
Grid
CAISO (California)
Plant ID
66023

What stands out

1

Grossmont-Cuyamaca-Cuyamaca Col. Solar & is a 2 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 13.4% capacity factor and 3 GWh annual generation.

3

Available financial measures include $1544/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#576 of 992
National rank
#5053 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.