Query
Grimes County Solar
Type
Entity Briefing
Entity
Grimes County Solar
Generated
2026-10-18T21:31:25.830Z

Briefing on Grimes County Solar

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
210 MW
Capacity
Operating
Current status
2026
Operating since
1
Generators
Briefing/plantOperating

Grimes County Solar is a 210 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.

Grimes County Solar is reported in Texas since 2026 under Grimes County Solar Project, LLC. Available operating and financial measures include $1543/kW reported CapEx.

Location
Grimes, Texas
Technology
Solar Photovoltaic
Owner / parent
Grimes County Solar Project, LLC
Operator
Grimes County Solar Project, LLC
Grid
ERCOT (Texas)
Plant ID
67046

What stands out

1

Grimes County Solar is a 210 MW Solar Photovoltaic asset in Texas with status Operating.

2

Available financial measures include $1543/kW CapEx.

3

1 linked queue projects represent 211 MW of proposed capacity.

4

Latest linked story: “Key Capture Energy completes ITC tax credit transfer for 200 MW BESS in Texas” (pv magazine USA, 2025-01-09).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#136 of 378
National rank
#330 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Grimes County Solar — verified asset snapshot

FieldValue
LocationGrimes, Texas
TechnologySolar Photovoltaic
Owner / parentGrimes County Solar Project, LLC
OperatorGrimes County Solar Project, LLC
GridERCOT (Texas)
Plant ID67046
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.