Gridley Main Two is a 3 MW Solar Photovoltaic asset in CAISO (California), currently Operating.
Gridley Main Two is reported in California since 2013 under Altus Power America Management, LLC. Available operating and financial measures include 15.6% capacity factor and 3 GWh annual generation; $29.9/MWh reported energy value.
- Location
- Butte, California
- Technology
- Solar Photovoltaic
- Owner / parent
- Altus Power America Management, LLC
- Operator
- Altus Power America Management, LLC
- Grid
- CAISO (California)
- Plant ID
- 58371
What stands out
Gridley Main Two is a 3 MW Solar Photovoltaic asset in California with status Operating.
Latest annual operating measures report 15.6% capacity factor and 3 GWh annual generation.
Available financial measures include $29.9/MWh energy value.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #553 of 992
- National rank
- #4959 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.