Query
Gregory Power Plant
Type
Entity Briefing
Entity
Gregory Power Plant
Generated
2026-10-11T04:38:41.069Z

Briefing on Gregory Power Plant

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
470 MW
Capacity
Operating
Current status
2000
Operating since
3
Generators
15.5%
Capacity factor
640 GWh
Annual generation
Briefing/plantOperating

Gregory Power Plant is a 470 MW Natural Gas Fired Combined Cycle asset in ERCOT (Texas), currently Operating.

Gregory Power Plant is reported in Texas since 2000 under Cheniere Energy. Available operating and financial measures include 15.5% capacity factor and 640 GWh annual generation; $965/kW reported CapEx.

Location
San Patricio, Texas
Technology
Natural Gas Fired Combined Cycle
Owner / parent
Cheniere Energy
Operator
Gregory Power Partners LLC
Grid
ERCOT (Texas)
Plant ID
55086

What stands out

1

Gregory Power Plant is a 470 MW Natural Gas Fired Combined Cycle asset in Texas with status Operating.

2

Latest annual operating measures report 15.5% capacity factor and 640 GWh annual generation.

3

Available financial measures include $965/kW CapEx.

4

1 linked queue projects represent 470 MW of proposed capacity.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#88 of 325
National rank
#526 of 2,025

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.