Query
Greenwater BESS
Type
Entity Briefing
Entity
Greenwater BESS
State
TN
Technology
battery
Generated
2026-09-20T12:12:07.297Z

Briefing on Greenwater BESS

Entity Briefing
Generated Sep 20, 2026·Dataset freshness not reported
200 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Greenwater BESS is a 200 MW Batteries asset in Washington, currently Under construction.

Greenwater BESS is reported in Washington under GREE bn, LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Pierce, Washington
Technology
Batteries
Owner / parent
GREE bn, LLC
Operator
GREE bn, LLC
Grid
Puget Sound Energy
Plant ID
68341

What stands out

1

Greenwater BESS is a 200 MW Batteries asset in Washington with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

Latest linked story: “CIP acquires 255MW/1020MWh battery storage project in Arizona” (Power Technology, 2024-09-26).

Market and operating context

Balancing authority
Puget Sound Energy
NERC region
WECC
State rank
#3 of 8
National rank
#196 of 994

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Greenwater BESS — verified asset snapshot

FieldValue
LocationPierce, Washington
TechnologyBatteries
Owner / parentGREE bn, LLC
OperatorGREE bn, LLC
GridPuget Sound Energy
Plant ID68341
Balancing authorityPuget Sound Energy
NERC regionWECC