Query
Green Ocelot Storage
Type
Entity Briefing
Entity
Green Ocelot Storage
Generated
2026-10-19T07:08:16.158Z

Briefing on Green Ocelot Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
179 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-11-17
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Green Ocelot Storage is a 179 MW Solar+Battery project in Texas, currently active.

Ocelot Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-11-17.

Queue ID
ERCOT-28INR0189
Location
Kenedy, Texas
Technology
Solar+Battery
Developer
Ocelot Solar LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 80076 Ajo 80076 - 8601 Cebolla

What stands out

1

Green Ocelot Storage is a 179 MW Solar+Battery project in Texas with status active.

2

Ocelot Solar LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-11-17.

Market and operating context

Queue date
2025-01-28
Proposed COD
2028-11-17
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Green Ocelot Storage — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0189
LocationKenedy, Texas
TechnologySolar+Battery
DeveloperOcelot Solar LLC
Market / regionERCOT
Point of interconnectionTap 345kV 80076 Ajo 80076 - 8601 Cebolla
Queue date2025-01-28
Proposed COD2028-11-17