Briefing/projectactive
Grayback Solar is a 222 MW Solar project in Texas, currently active.
Grayback Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-01.
- Queue ID
- ERCOT-28INR0464
- Location
- Wilbarger, Texas
- Technology
- Solar
- Developer
- Grayback Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- To Riley7A Substation (#6101)
What stands out
1
Grayback Solar is a 222 MW Solar project in Texas with status active.
2
Grayback Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-09-01.
Market and operating context
- Queue date
- 2025-11-05
- Proposed COD
- 2029-09-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.