Gray County Wind Energy is a 112 MW Onshore Wind Turbine asset in SPP (Southwest Power Pool), currently Operating.
Gray County Wind Energy is reported in Kansas since 2001 under NextEra Energy. Available operating and financial measures include 26.8% capacity factor and 264 GWh annual generation; $1895/kW reported CapEx.
- Location
- Gray, Kansas
- Technology
- Onshore Wind Turbine
- Owner / parent
- NextEra Energy
- Operator
- Gray County Wind Energy LLC
- Grid
- SPP (Southwest Power Pool)
- Plant ID
- 55734
What stands out
Gray County Wind Energy is a 112 MW Onshore Wind Turbine asset in Kansas with status Operating.
Latest annual operating measures report 26.8% capacity factor and 264 GWh annual generation.
Available financial measures include $1895/kW CapEx.
Latest linked story: “Earnings call transcript: NextEra Energy Q1 2026 results beat EPS forecast” (Investing.com, 2026-04-28).
Market and operating context
- ISO / market
- SPP (Southwest Power Pool)
- Balancing authority
- Southwest Power Pool
- NERC region
- MRO
- State rank
- #41 of 53
- National rank
- #652 of 1,442
Why it matters
For this asset in SPP (Southwest Power Pool), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.