Grant County is a 300 MW Batteries asset in MISO (Midcontinent), currently Operating.
Grant County is reported in Wisconsin since 2024 under Alliant Energy. Available operating and financial measures include 14.3% capacity factor and 376 GWh annual generation; $1411/kW reported CapEx.
- Location
- Grant, Wisconsin
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Alliant Energy
- Operator
- Wisconsin Power & Light Co
- Grid
- MISO (Midcontinent)
- Plant ID
- 65007
What stands out
Grant County is a 300 MW Batteries asset in Wisconsin with status Operating.
Latest annual operating measures report 14.3% capacity factor and 376 GWh annual generation.
Available financial measures include $2.8/MWh OpEx, $1411/kW CapEx.
Latest linked story: “New 100 MW battery now storing and releasing energy in Grant County, Wisconsin” (Renewable Energy Magazine, 2025-10-17).
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
- State rank
- #4 of 132
- National rank
- #148 of 7,971
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.