Briefing/projectsuspended
Grandview 5 W is a 249 MW Wind project in Texas, currently suspended.
Eon is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2022-12-15.
- Queue ID
- ERCOT-08INR0019b
- Location
- Gray, Texas
- Technology
- Wind
- Developer
- Eon
- Market / region
- ERCOT
- Point of interconnection
- 79005 Railhead 345kV
What stands out
1
Grandview 5 W is a 249 MW Wind project in Texas with status suspended.
2
Eon is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2022-12-15.
Market and operating context
- Queue date
- 2006-07-20
- Proposed COD
- 2022-12-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.