Briefing/projectactive
GPlains Solar is a 151 MW Solar+Battery project in Texas, currently active.
Gypsum Plains Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-06-21.
- Queue ID
- ERCOT-28INR0227
- Location
- Ector, Texas
- Technology
- Solar+Battery
- Developer
- Gypsum Plains Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV #1013 WOLFSS_8 - #1103 SANDHLTA_8
What stands out
1
GPlains Solar is a 151 MW Solar+Battery project in Texas with status active.
2
Gypsum Plains Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-06-21.
Market and operating context
- Queue date
- 2025-04-21
- Proposed COD
- 2029-06-21
- IA status
- Facility Study
- Study phase
- Facility Study