Briefing/plantOperating
Goshen Phase II is a 125 MW Onshore Wind Turbine asset in Idaho, currently Operating.
Goshen Phase II is reported in Idaho since 2010 under Clearlight Energy Holdings LP. Available operating and financial measures include 33.8% capacity factor and 369 GWh annual generation; $1895/kW reported CapEx.
- Location
- Bonneville, Idaho
- Technology
- Onshore Wind Turbine
- Owner / parent
- Clearlight Energy Holdings LP
- Operator
- Clearlight Energy Holdings LP
- Grid
- PacifiCorp - East
- Plant ID
- 57211
What stands out
1
Goshen Phase II is a 125 MW Onshore Wind Turbine asset in Idaho with status Operating.
2
Latest annual operating measures report 33.8% capacity factor and 369 GWh annual generation.
3
Available financial measures include $1895/kW CapEx.
Market and operating context
- Balancing authority
- PacifiCorp - East
- NERC region
- WECC
- State rank
- #3 of 34
- National rank
- #613 of 1,442
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.