Query
Gonzaga Ridge Battery Facility
Type
Entity Briefing
Entity
Gonzaga Ridge Battery Facility
Technology
battery
Generated
2026-10-17T12:35:31.123Z

Briefing on Gonzaga Ridge Battery Facility

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
52 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Gonzaga Ridge Battery Facility is a 52 MW Batteries asset in CAISO (California), currently Under construction.

Gonzaga Ridge Battery Facility is reported in California under Gonzaga Ridge Battery Facility, LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Merced, California
Technology
Batteries
Owner / parent
Gonzaga Ridge Battery Facility, LLC
Operator
Gonzaga Ridge Battery Facility, LLC
Grid
CAISO (California)
Plant ID
68980

What stands out

1

Gonzaga Ridge Battery Facility is a 52 MW Batteries asset in California with status Under construction.

2

Available financial measures include $1361/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#96 of 202
National rank
#449 of 994

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Gonzaga Ridge Battery Facility — verified asset snapshot

FieldValue
LocationMerced, California
TechnologyBatteries
Owner / parentGonzaga Ridge Battery Facility, LLC
OperatorGonzaga Ridge Battery Facility, LLC
GridCAISO (California)
Plant ID68980
ISO / marketCAISO (California)
Balancing authorityCalifornia Independent System Operator