Golden Hills North Wind Energy Center is a 46 MW Onshore Wind Turbine asset in CAISO (California), currently Operating.
Golden Hills North Wind Energy Center is reported in California since 2017 under NextEra Energy. Available operating and financial measures include 35.3% capacity factor and 143 GWh annual generation; $2254/kW reported CapEx.
- Location
- Alameda, California
- Technology
- Onshore Wind Turbine
- Owner / parent
- NextEra Energy
- Operator
- Golden Hills Interconnection Wind, LLC
- Grid
- CAISO (California)
- Plant ID
- 61222
What stands out
Golden Hills North Wind Energy Center is a 46 MW Onshore Wind Turbine asset in California with status Operating.
Latest annual operating measures report 35.3% capacity factor and 143 GWh annual generation.
Available financial measures include $2254/kW CapEx.
Latest linked story: “Earnings call transcript: NextEra Energy Q1 2026 results beat EPS forecast” (Investing.com, 2026-04-28).
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #52 of 116
- National rank
- #974 of 1,442
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.