Briefing on GOLDEN FIELDS SOLAR

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
100 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2026-12-01
Proposed COD
C08
Queue phase
Briefing/projectactive

GOLDEN FIELDS SOLAR is a 100 MW Battery project in California, currently active.

The reported queue phase is C08. Proposed COD is 2026-12-01.

Queue ID
CAISO-1212
Location
Kern, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Whirlwind Substation 220kV

What stands out

1

GOLDEN FIELDS SOLAR is a 100 MW Battery project in California with status active.

2

The reported queue phase is C08; proposed COD is 2026-12-01.

3

Latest linked story: “Clearway wraps up 140-MW solar, 117-MW storage project in Kern County” (Solar Power World, 2025-11-05).

Market and operating context

Queue date
2015-04-30
Proposed COD
2026-12-01
IA status
IA Executed
Study phase
C08
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

GOLDEN FIELDS SOLAR — verified asset snapshot

FieldValue
Queue IDCAISO-1212
LocationKern, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionWhirlwind Substation 220kV
Queue date2015-04-30
Proposed COD2026-12-01
IA statusIA Executed