Briefing/projectactive
GOLDEN FIELDS SOLAR is a 100 MW Battery project in California, currently active.
The reported queue phase is C08. Proposed COD is 2026-12-01.
- Queue ID
- CAISO-1212
- Location
- Kern, California
- Technology
- Battery
- Market / region
- CAISO
- Point of interconnection
- Whirlwind Substation 220kV
What stands out
1
GOLDEN FIELDS SOLAR is a 100 MW Battery project in California with status active.
2
The reported queue phase is C08; proposed COD is 2026-12-01.
3
Latest linked story: “Clearway wraps up 140-MW solar, 117-MW storage project in Kern County” (Solar Power World, 2025-11-05).
Market and operating context
- Queue date
- 2015-04-30
- Proposed COD
- 2026-12-01
- IA status
- IA Executed
- Study phase
- C08
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.