Query
Goby Energy Center
Type
Entity Briefing
Entity
Goby Energy Center
Generated
2026-10-19T06:20:41.394Z

Briefing on Goby Energy Center

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Goby Energy Center is a 201 MW Battery project in Texas, currently active.

Goby Energy Center is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-09-30.

Queue ID
ERCOT-27INR0209
Location
Brazoria, Texas
Technology
Battery
Developer
Goby Energy Center
Market / region
ERCOT
Point of interconnection
Tap 138kV line 44390 Karsten - 44721 Thompsons

What stands out

1

Goby Energy Center is a 201 MW Battery project in Texas with status active.

2

Goby Energy Center is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-09-30.

Market and operating context

Queue date
2024-05-20
Proposed COD
2027-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Goby Energy Center — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0209
LocationBrazoria, Texas
TechnologyBattery
DeveloperGoby Energy Center
Market / regionERCOT
Point of interconnectionTap 138kV line 44390 Karsten - 44721 Thompsons
Queue date2024-05-20
Proposed COD2027-09-30