Query
Glenrock
Type
Entity Briefing
Entity
Glenrock
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Glenrock

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

166 MW
Capacity
Operating
Current status
2008
Operating since
2
Generators
27.6%
Capacity factor
401 GWh
Annual generation
Briefing/plantOperating

Glenrock is a 166 MW Onshore Wind Turbine asset in Wyoming, currently Operating.

Glenrock is reported in Wyoming since 2008 under Berkshire Hathaway. Available operating and financial measures include 27.6% capacity factor and 401 GWh annual generation.

Location
Converse, Wyoming
Technology
Onshore Wind Turbine
Owner / parent
Berkshire Hathaway
Operator
PacifiCorp
Grid
PacifiCorp - East
Plant ID
56841

What stands out

1

Glenrock is a 166 MW Onshore Wind Turbine asset in Wyoming with status Operating.

2

Latest annual operating measures report 27.6% capacity factor and 401 GWh annual generation.

3

Latest linked story: “Tripped power lines cut electricity to 95,000 Wyoming customers” (WyoFile, 2025-11-13).

Market and operating context

Balancing authority
PacifiCorp - East
NERC region
WECC
State rank
#12 of 31
National rank
#448 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.