Gilead Foster City Solar Project is a 2 MW Batteries asset in CAISO (California), currently Operating.
Gilead Foster City Solar Project is reported in California since 2021 under Gilead Sciences Inc. Foster City. Available operating and financial measures include 13.8% capacity factor and 2 GWh annual generation; $30.5/MWh reported energy value.
- Location
- San Mateo, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Gilead Sciences Inc. Foster City
- Operator
- Gilead Sciences Inc. Foster City
- Grid
- CAISO (California)
- Plant ID
- 65409
What stands out
Gilead Foster City Solar Project is a 2 MW Batteries asset in California with status Operating.
Latest annual operating measures report 13.8% capacity factor and 2 GWh annual generation.
Available financial measures include $30.5/MWh energy value.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #692 of 992
- National rank
- #6451 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.