Query
Gilead Foster City Solar Project
Type
Entity Briefing
Entity
Gilead Foster City Solar Project
Technology
solar
Generated
2026-10-18T01:06:58.372Z

Briefing on Gilead Foster City Solar Project

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2021
Operating since
3
Generators
13.8%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

Gilead Foster City Solar Project is a 2 MW Batteries asset in CAISO (California), currently Operating.

Gilead Foster City Solar Project is reported in California since 2021 under Gilead Sciences Inc. Foster City. Available operating and financial measures include 13.8% capacity factor and 2 GWh annual generation; $30.5/MWh reported energy value.

Location
San Mateo, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
Gilead Sciences Inc. Foster City
Operator
Gilead Sciences Inc. Foster City
Grid
CAISO (California)
Plant ID
65409

What stands out

1

Gilead Foster City Solar Project is a 2 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 13.8% capacity factor and 2 GWh annual generation.

3

Available financial measures include $30.5/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#692 of 992
National rank
#6451 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.