Briefing on GIGA AUSTIN SOLAR

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
active
Current status
Solar
Technology
ERCOT
Market / region
2027-03-14
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

GIGA AUSTIN SOLAR is a 0 MW Solar project in Texas, currently active.

Giga Texas Energy is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-03-14.

Queue ID
ERCOT-24INR0372
Location
Travis, Texas
Technology
Solar
Developer
Giga Texas Energy
Market / region
ERCOT
Point of interconnection
7047 HORNSBY Substation 138kV

What stands out

1

GIGA AUSTIN SOLAR is a 0 MW Solar project in Texas with status active.

2

Giga Texas Energy is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-03-14.

Market and operating context

Queue date
2022-07-18
Proposed COD
2027-03-14
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

GIGA AUSTIN SOLAR — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0372
LocationTravis, Texas
TechnologySolar
DeveloperGiga Texas Energy
Market / regionERCOT
Point of interconnection7047 HORNSBY Substation 138kV
Queue date2022-07-18
Proposed COD2027-03-14