Briefing on GIBSON BRANCH BESS

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
143 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-01-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

GIBSON BRANCH BESS is a 143 MW Battery project in Texas, currently active.

Gibson Branch BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-01-15.

Queue ID
ERCOT-25INR0666
Location
Lampasas, Texas
Technology
Battery
Developer
Gibson Branch BESS LLC
Market / region
ERCOT
Point of interconnection
7064 Lampasas Substation 138kV

What stands out

1

GIBSON BRANCH BESS is a 143 MW Battery project in Texas with status active.

2

Gibson Branch BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-01-15.

Market and operating context

Queue date
2024-05-20
Proposed COD
2028-01-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

GIBSON BRANCH BESS — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0666
LocationLampasas, Texas
TechnologyBattery
DeveloperGibson Branch BESS LLC
Market / regionERCOT
Point of interconnection7064 Lampasas Substation 138kV
Queue date2024-05-20
Proposed COD2028-01-15