Georgia-Lynn BESS is a 109 MW Battery project in Texas, currently active.
Georgia Lynn BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-02-20.
- Queue ID
- ERCOT-26INR0559
- Location
- Victoria, Texas
- Technology
- Battery
- Developer
- Georgia Lynn BESS LLC
- Market / region
- ERCOT
- Point of interconnection
- 80064 CHOCBAYU4A 138 kV
What stands out
1
Georgia-Lynn BESS is a 109 MW Battery project in Texas with status active.
2
Georgia Lynn BESS LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-02-20.
Market and operating context
- Queue date
- 2024-07-30
- Proposed COD
- 2028-02-20
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.