Query
Georgia-Lynn BESS
Type
Entity Briefing
Entity
Georgia-Lynn BESS
State
GA
Technology
battery
Generated
2026-10-06T14:47:43.001Z

Briefing on Georgia-Lynn BESS

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
109 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-02-20
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Georgia-Lynn BESS is a 109 MW Battery project in Texas, currently active.

Georgia Lynn BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-02-20.

Queue ID
ERCOT-26INR0559
Location
Victoria, Texas
Technology
Battery
Developer
Georgia Lynn BESS LLC
Market / region
ERCOT
Point of interconnection
80064 CHOCBAYU4A 138 kV

What stands out

1

Georgia-Lynn BESS is a 109 MW Battery project in Texas with status active.

2

Georgia Lynn BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-02-20.

Market and operating context

Queue date
2024-07-30
Proposed COD
2028-02-20
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Georgia-Lynn BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0559
LocationVictoria, Texas
TechnologyBattery
DeveloperGeorgia Lynn BESS LLC
Market / regionERCOT
Point of interconnection80064 CHOCBAYU4A 138 kV
Queue date2024-07-30
Proposed COD2028-02-20