Gemma Energy Storage is a 200 MW Battery project in New York, currently active.
Hanwha Q CELLS USA Corp. is the reported developer. The reported queue phase is C24. Proposed COD is 2027-12-01.
- Queue ID
- NYISO-C24-060
- Location
- Steuben, New York
- Technology
- Battery
- Developer
- Hanwha Q CELLS USA Corp.
- Market / region
- NYISO
- Point of interconnection
- Stony Ridge 230kV
What stands out
Gemma Energy Storage is a 200 MW Battery project in New York with status active.
Hanwha Q CELLS USA Corp. is the reported developer.
The reported queue phase is C24; proposed COD is 2027-12-01.
Latest linked story: “Spearmint Energy Secures $47.5 Million Project Finance Term Loan from Manulife for Battery Energy Storage Project in ERCOT” (Business Wire, 2024-02-06).
Market and operating context
- Queue date
- 2024-08-01
- Proposed COD
- 2027-12-01
- Study phase
- C24
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.