Query
Gatsby Energy Storage
Type
Entity Briefing
Entity
Gatsby Energy Storage
Generated
2026-10-19T22:34:50.392Z

Briefing on Gatsby Energy Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
103 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-03-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Gatsby Energy Storage is a 103 MW Battery project in Texas, currently active.

Gatsby Energy Storage is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-03-31.

Queue ID
ERCOT-27INR0139
Location
Pecos, Texas
Technology
Battery
Developer
Gatsby Energy Storage
Market / region
ERCOT
Point of interconnection
Fort Lancaster 138 kV Substation (PSSE Bus #76579)

What stands out

1

Gatsby Energy Storage is a 103 MW Battery project in Texas with status active.

2

Gatsby Energy Storage is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-03-31.

Market and operating context

Queue date
2024-02-07
Proposed COD
2027-03-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Gatsby Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0139
LocationPecos, Texas
TechnologyBattery
DeveloperGatsby Energy Storage
Market / regionERCOT
Point of interconnectionFort Lancaster 138 kV Substation (PSSE Bus #76579)
Queue date2024-02-07
Proposed COD2027-03-31