Query
GATEWAY ENERGY STORAGE 2
Type
Entity Briefing
Entity
GATEWAY ENERGY STORAGE 2
Generated
2026-10-12T00:36:51.291Z

Briefing on GATEWAY ENERGY STORAGE 2

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
256 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2035-02-05
Proposed COD
C14
Queue phase
Briefing/projectactive

GATEWAY ENERGY STORAGE 2 is a 256 MW Battery project in California, currently active.

The reported queue phase is C14. Proposed COD is 2035-02-05.

Queue ID
CAISO-2185
Location
San Diego, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Otay Mesa Switchyard 230 kV

What stands out

1

GATEWAY ENERGY STORAGE 2 is a 256 MW Battery project in California with status active.

2

The reported queue phase is C14; proposed COD is 2035-02-05.

3

Latest linked story: “Governor Newsom welcomes approval of Diablo Canyon license renewals, delivering on California’s commitment to a clean and reliable grid” (California State Portal | CA.gov, 2026-04-03).

Market and operating context

Queue date
2021-04-15
Proposed COD
2035-02-05
IA status
System Impact Study
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

GATEWAY ENERGY STORAGE 2 — verified asset snapshot

FieldValue
Queue IDCAISO-2185
LocationSan Diego, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionOtay Mesa Switchyard 230 kV
Queue date2021-04-15
Proposed COD2035-02-05
IA statusSystem Impact Study