Query
Gary Solar
Type
Entity Briefing
Entity
Gary Solar
State
MD
Generated
2026-10-11T12:50:54.265Z

Briefing on Gary Solar

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2018
Operating since
1
Generators
20.1%
Capacity factor
4 GWh
Annual generation
Briefing/plantOperating

Gary Solar is a 2 MW Solar Photovoltaic asset in South Carolina, currently Operating.

Gary Solar is reported in South Carolina since 2018 under Altus Power America Management, LLC. Available operating and financial measures include 20.1% capacity factor and 4 GWh annual generation; $20.9/MWh reported energy value.

Location
Lee, South Carolina
Technology
Solar Photovoltaic
Owner / parent
Altus Power America Management, LLC
Operator
Altus Power America Management, LLC
Grid
Duke Energy Progress East
Plant ID
61942

What stands out

1

Gary Solar is a 2 MW Solar Photovoltaic asset in South Carolina with status Operating.

2

Latest annual operating measures report 20.1% capacity factor and 4 GWh annual generation.

3

Available financial measures include $20.9/MWh energy value.

Market and operating context

Balancing authority
Duke Energy Progress East
NERC region
SERC
State rank
#106 of 146
National rank
#5809 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.