Query
Gary Solar
Type
Entity Briefing
Entity
Gary Solar
State
MD
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Gary Solar

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

2 MW
Capacity
Operating
Current status
2018
Operating since
1
Generators
20.1%
Capacity factor
4 GWh
Annual generation
Briefing/plantOperating

Gary Solar is a 2 MW Solar Photovoltaic asset in South Carolina, currently Operating.

Gary Solar is reported in South Carolina since 2018 under Altus Power America Management, LLC. Available operating and financial measures include 20.1% capacity factor and 4 GWh annual generation; $20.9/MWh reported energy value.

Location
Lee, South Carolina
Technology
Solar Photovoltaic
Owner / parent
Altus Power America Management, LLC
Operator
Altus Power America Management, LLC
Grid
Duke Energy Progress East
Plant ID
61942

What stands out

1

Gary Solar is a 2 MW Solar Photovoltaic asset in South Carolina with status Operating.

2

Latest annual operating measures report 20.1% capacity factor and 4 GWh annual generation.

3

Available financial measures include $20.9/MWh energy value.

Market and operating context

Balancing authority
Duke Energy Progress East
NERC region
SERC
State rank
#106 of 146
National rank
#5809 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.