Query
Ganado Solar
Type
Entity Briefing
Entity
Ganado Solar
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Ganado Solar

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

221 MW
Capacity
Operating
Current status
2023
Operating since
2
Generators
17.5%
Capacity factor
340 GWh
Annual generation
Briefing/plantOperating

Ganado Solar is a 221 MW Batteries asset in ERCOT (Texas), currently Operating.

Ganado Solar is reported in Texas since 2023 under Enel Green Power NA, Inc.. Available operating and financial measures include 17.5% capacity factor and 340 GWh annual generation; $23.2/MWh reported energy value.

Location
Jackson, Texas
Technology
Batteries, Solar Photovoltaic
Owner / parent
Enel Green Power NA, Inc.
Operator
Enel Green Power NA, Inc.
Grid
ERCOT (Texas)
Plant ID
67284

What stands out

1

Ganado Solar is a 221 MW Batteries asset in Texas with status Operating.

2

Latest annual operating measures report 17.5% capacity factor and 340 GWh annual generation.

3

Available financial measures include $23.2/MWh energy value.

4

Latest linked story: “ENEL PARTNERS WITH NESTLÉ FOR INVESTMENT IN GANADO SOLAR PROJECT” (PR Newswire, 2023-03-22).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#130 of 378
National rank
#319 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.