Briefing/plantOperating
Galesville Project is a 2 MW Conventional Hydroelectric asset in Oregon, currently Operating.
Galesville Project is reported in Oregon since 1987 under Douglas County - (OR). Available operating and financial measures include 18.4% capacity factor and 3 GWh annual generation; $2294/kW reported CapEx.
- Location
- Douglas, Oregon
- Technology
- Conventional Hydroelectric
- Owner / parent
- Douglas County - (OR)
- Operator
- Douglas County - (OR)
- Grid
- PacifiCorp - West
- Plant ID
- 50938
What stands out
1
Galesville Project is a 2 MW Conventional Hydroelectric asset in Oregon with status Operating.
2
Latest annual operating measures report 18.4% capacity factor and 3 GWh annual generation.
3
Available financial measures include $2294/kW CapEx.
Market and operating context
- Balancing authority
- PacifiCorp - West
- NERC region
- WECC
- State rank
- #56 of 63
- National rank
- #1295 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.