Galaxy Solar 2 is a 302 MW Solar project in Texas, currently active.
Galaxy Solar 2, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-10-30.
- Queue ID
- ERCOT-28INR0385
- Location
- Ellis, Texas
- Technology
- Solar
- Developer
- Galaxy Solar 2, LLC
- Market / region
- ERCOT
- Point of interconnection
- 3/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navarro Switch (LST) (#68091) BKR 3B3134/3B3127
What stands out
1
Galaxy Solar 2 is a 302 MW Solar project in Texas with status active.
2
Galaxy Solar 2, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-10-30.
Market and operating context
- Queue date
- 2025-06-19
- Proposed COD
- 2029-10-30
- IA status
- Facility Study
- Study phase
- Facility Study