Briefing/projectsuspended
Funston Solar (AEP POI) is a 355 MW Solar project in Texas, currently suspended.
Proposed COD is 2028-07-01.
- Queue ID
- ERCOT-27INR0065
- Location
- Jones, Texas
- Technology
- Solar
- Market / region
- ERCOT
What stands out
1
Funston Solar (AEP POI) is a 355 MW Solar project in Texas with status suspended.
2
proposed COD is 2028-07-01.
3
Latest linked story: “Proposed Jones County solar project takes step forward” (Abilene Reporter-News, 2018-08-28).
Market and operating context
- Queue date
- 2023-09-21
- Proposed COD
- 2028-07-01
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.