Briefing/projectactive
Fudge Ranch BESS is a 104 MW Battery project in Texas, currently active.
Crandall BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-06-30.
- Queue ID
- ERCOT-26INR0502
- Location
- Kaufman, Texas
- Technology
- Battery
- Developer
- Crandall BESS LLC
- Market / region
- ERCOT
- Point of interconnection
- 6902<6902><TALTY_RC><138kV>
What stands out
1
Fudge Ranch BESS is a 104 MW Battery project in Texas with status active.
2
Crandall BESS LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-06-30.
Market and operating context
- Queue date
- 2024-04-15
- Proposed COD
- 2027-06-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.