Query
Fudge Ranch BESS
Type
Entity Briefing
Entity
Fudge Ranch BESS
State
TN
Technology
battery
Generated
2026-10-19T18:36:23.703Z

Briefing on Fudge Ranch BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
104 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-06-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Fudge Ranch BESS is a 104 MW Battery project in Texas, currently active.

Crandall BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-06-30.

Queue ID
ERCOT-26INR0502
Location
Kaufman, Texas
Technology
Battery
Developer
Crandall BESS LLC
Market / region
ERCOT
Point of interconnection
6902<6902><TALTY_RC><138kV>

What stands out

1

Fudge Ranch BESS is a 104 MW Battery project in Texas with status active.

2

Crandall BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-06-30.

Market and operating context

Queue date
2024-04-15
Proposed COD
2027-06-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Fudge Ranch BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0502
LocationKaufman, Texas
TechnologyBattery
DeveloperCrandall BESS LLC
Market / regionERCOT
Point of interconnection6902<6902><TALTY_RC><138kV>
Queue date2024-04-15
Proposed COD2027-06-30