Query
Fresno Sunnyside High School Hybrid
Type
Entity Briefing
Entity
Fresno Sunnyside High School Hybrid
State
MI
Technology
hybrid
Generated
2026-06-25T19:40:21.609Z

Briefing on Fresno Sunnyside High School Hybrid

Entity Briefing
Generated Jun 25, 2026·Data as of Jun 25
2
Generators
2 MW
Capacity
16.0%
Capacity Factor
3 GWh
Annual Generation

Fresno Sunnyside High School Hybrid is an operational hybrid solar and battery plant in California, showing a recent 13% decline in generation despite its steady operational history since 2020.

Overview

  • Fresno Sunnyside High School Hybrid is an Operating plant in California.
  • It has been operational since 2020.
  • The plant is operated and owned by Forefront Power, LLC.

Fleet Details

  • The plant has 2 generators utilizing Batteries and Solar Photovoltaic technologies.
  • It has a capacity factor of 16.0%.
  • Annual generation is 3 GWh.
  • Recent generation data shows 0 GWh for October, November, and December 2024.
  • Generation has trended down 13% over the past 6 months compared to the prior 6 months.

Financial Profile

  • The energy value is $8.2/MWh.
  • Financial data is available spanning 4 years (2021–2024).

Grid Integration

  • The plant is connected to the CAISO (California) ISO, WECC NERC region, and California Independent System Operator BA.

Fresno Sunnyside High School Hybrid, a hybrid solar and battery plant, demonstrates a consistent operational history since 2020, though recent generation figures indicate a significant decline. The plant's financial profile, with an energy value of $8.2/MWh, provides a baseline for evaluating its economic performance within the California grid.

View full details