Query
Fresno Solar
Type
Entity Briefing
Entity
Fresno Solar
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on Fresno Solar

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

3 MW
Capacity
Operating
Current status
2015
Operating since
2
Generators
17.9%
Capacity factor
5 GWh
Annual generation
Briefing/plantOperating

Fresno Solar is a 3 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Fresno Solar is reported in California since 2015 under Wellhead Electric Company. Available operating and financial measures include 17.9% capacity factor and 5 GWh annual generation; $4.1/MWh reported energy value.

Location
Fresno, California
Technology
Solar Photovoltaic
Owner / parent
Wellhead Electric Company
Operator
Wellhead Services, Inc
Grid
CAISO (California)
Plant ID
60083

What stands out

1

Fresno Solar is a 3 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 17.9% capacity factor and 5 GWh annual generation.

3

Available financial measures include $4.1/MWh energy value.

4

Latest linked story: “California Fast-Tracks Fresno Solar-Battery Project with Regulatory-Easing Measure” (ENR, 2025-03-28).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#516 of 992
National rank
#4553 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.