Query
Fresno Solar
Type
Entity Briefing
Entity
Fresno Solar
Generated
2026-10-09T17:17:00.634Z

Briefing on Fresno Solar

Entity Briefing
Generated Oct 9, 2026·Dataset freshness not reported
3 MW
Capacity
Operating
Current status
2015
Operating since
2
Generators
17.9%
Capacity factor
5 GWh
Annual generation
Briefing/plantOperating

Fresno Solar is a 3 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Fresno Solar is reported in California since 2015 under Wellhead Electric Company. Available operating and financial measures include 17.9% capacity factor and 5 GWh annual generation; $4.1/MWh reported energy value.

Location
Fresno, California
Technology
Solar Photovoltaic
Owner / parent
Wellhead Electric Company
Operator
Wellhead Services, Inc
Grid
CAISO (California)
Plant ID
60083

What stands out

1

Fresno Solar is a 3 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 17.9% capacity factor and 5 GWh annual generation.

3

Available financial measures include $4.1/MWh energy value.

4

Latest linked story: “California Fast-Tracks Fresno Solar-Battery Project with Regulatory-Easing Measure” (ENR, 2025-03-28).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#516 of 992
National rank
#4553 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.